0 % the average development period 0 t general rubbish removed 0 m³ asbestos-contaminated soil removed 0 m³ engineer fill 2021 GARUS AVENUE, MANGERE EAST This project involved removing 2,000 tons of general rubbish and 3,000 cbm (cubic metres) of asbestos-contaminated soil and filling it with 10,000 cbm of engineer fill. Maxion built up stormwater […]