Contact Info

Ranolf Street, Rotorua

0 m Drainage 0 ㎡ Landscaping 0 m³ Bulk Earthworks 2023 Ranolf Street Subdivision The Ranolf Street subdivision, located in the heart of Rotorua and spanning approximately 2 hectares, posed various environmental and project-related challenges. However, we effectively addressed these challenges through proactive measures such as early engagement with neighbors and stakeholders, as well as […]

Albany Heights Rd, Albany

0 m Retaining Wall 0 ㎡ Soil Removed 0 m³ Cut to Fill 2022 Albany Heights Road Subdivision Located in Dairy Flat, Auckland, the site encompasses a total work area of 3.3 hectares. This particular site posed a range of environmental challenges, including the need to protect wildlife under Resource Consent (RC) conditions. Our work […]

Garus Ave, Mangere East

0 % the average development period​ 0 t general rubbish removed​ 0 m³ asbestos-contaminated soil removed​ 0 m³ engineer fill​ 2021 GARUS AVENUE, MANGERE EAST This project involved removing 2,000 tons of general rubbish and 3,000 cbm (cubic metres) of asbestos-contaminated soil and filling it with 10,000 cbm of engineer fill. Maxion built up stormwater […]

Cottingham Cres, Mangere

0 % the average development period​ 0 t general rubbish removed​ 0 m³ asbestos-contaminated soil removed​ 0 m³ engineer fill​ 2021 COTTINGHAM CRES, MANGERE Description is comming… Services Provided:   Drainage & Pipelines Roading & Maintenance Kerb & Channel Deconstruction Land Surveying Heavy Machinery Hire