Garus Ave, Mangere East

the average development period​ 0 % general rubbish removed​ 0 t asbestos-contaminated soil removed​ 0 m³ engineer fill​ 0 m³ 2021 GARUS AVENUE, MANGERE EAST This fast-tracked development project involved the removal of 2,000 tonnes of general waste and 3,000m³ of asbestos-contaminated soil, followed by the placement of 10,000m³ of engineered fill to prepare the […]