Contact Info

Fred Taylor Dr, Whenuapai

Fences 0 m Top Soil Removed 0 m³ Cut to Fill 0 m³ 2023 Fred Taylor Dr, Whenuapai Back The Stage 1 redevelopment of the Whenuapai Flower Planting Farm involved extensive site preparation and infrastructure works. Maxion Civil installed sediment control measures and undertook contaminated soil treatment before completing site levelling across a 4-hectare area. […]

Papatoetoe West School

Fences 0 m Top Soil Removed 0 m³ Cut to Fill 0 m³ 2022 Papatoetoe West School – Drainage Upgrade The drainage upgrade at Papatoetoe West School was undertaken to resolve persistent waterlogging issues across the school grounds, particularly around the hall, carpark, and playing fields. The site had long experienced poor runoff and pooling, […]

Sir Edmund Hillary Collegiate

Fences 0 m Top Soil Removed 0 m³ Cut to Fill 0 m³ 2022 Sir Edmund Hillary Collegiate, Otara The drainage upgrade at Sir Edmund Hillary Collegiate was initiated to address ongoing flooding and water damage across the school’s paved areas. The existing stormwater system was underperforming, resulting in surface deterioration and operational disruptions during […]

Albany Heights Rd, Albany

Retaining Wall 0 m Soil Removed 0 ㎡ Cut to Fill 0 m³ 2022 Albany Heights Road Subdivision Back Located in Dairy Flat, Auckland, the Albany Heights Road subdivision encompassed a total work area of 40 hectares. The project presented unique environmental challenges under strict Resource Consent conditions, requiring the protection of native wildlife habitats—including […]

Pinehurst school, Albany

Fences 0 m Top Soil Removed 0 m³ Cut to Fill 0 m³ 2021 Pinehurst School Back The Pinehurst School PUDO redevelopment focused on improving traffic flow, safety, and stormwater management within the school’s busy drop-off zone. The project involved extensive site preparation, including earthworks, sediment control, roading, concrete works, and stormwater infrastructure. Maxion Civil […]

Garus Ave, Mangere East

the average development period​ 0 % general rubbish removed​ 0 t asbestos-contaminated soil removed​ 0 m³ engineer fill​ 0 m³ 2021 GARUS AVENUE, MANGERE EAST Back The Garus Avenue development in Māngere East was a fast-tracked project that involved the removal of 2,000 tonnes of general waste and 3,000 m³ of asbestos-contaminated soil, followed by […]

Cottingham Cres, Mangere

the average development period​ 0 % general rubbish removed​ 0 t asbestos-contaminated soil removed​ 0 m³ engineer fill​ 0 m³ 2021 COTTINGHAM CRES, MANGERE – 35 Lots Back The Cottingham Crescent development in Māngere was a fast-tracked project that involved the removal of 2,000 tonnes of general waste and 3,000 m³ of asbestos-contaminated soil, followed […]

Whites Rd, Whitford

Soil removed 0 m³ Geogrid 0 ㎡ Engineered fill 0 m³ 2020 Whites Rd, Whitford Back Situated in Whitford, Auckland, this project presented numerous challenges for the Maxion Civil team. The scope involved the restoration and slip remediation of 50,000 m³ of earthworks and lime stabilisation, the construction of two Mechanically Stabilised Earth (MSE) walls, […]

Macleans College

Fences 0 m Top Soil Removed 0 m³ Cut to Fill 0 m³ 2020 Macleans College, Eastern Beach – Basketball Court Remediation The Macleans College basketball court remediation was a fast-tracked civil works project involving the demolition and removal of existing pavement, fencing, retaining walls, and drainage structures. Over 295 m³ of material was excavated […]

Wanganui Airport

month complete 0 m NB concrete lined steel sewer 0 mm OD concrete lined steel sewer 0 mm laying sewer 0 m 2006 WANGANUI AIRPORT Back This project was undertaken at Wanganui Airport, where our team worked under tight time constraints to complete the installation of critical sewer infrastructure. The scope involved laying 1,500 meters […]